In the case of a "JIT turnout sleeper", the entire section is assembled in the concrete sleeper factory and then delivered directly to the construction site in fully assembled condition. The overall process of production and delivery is leaner and…
At the beginning of November 2017, TSF-A GmbH delivered narrow-gauge turnout sleepers to the MGB (Matterhorn-Gotthard-Bahn) with a specially vaW-designed loading device. The components were delivered fully assembled from Zeltweg to Segnas in the Swiss canton of Graubünden on regular…